MarineActivityCoastal AIS, clearly readOpen live map

CHANGE ORDER

UnknownUnknownUnited Kingdom

No position heldSource:

Identity

Name
CHANGE ORDER
MMSI
232065011
IMO number
Not reported
Call sign
Not reported
Station type
Ship station

Classification & hull

AIS type code
Not reported
Type
Unknown
Category
Unknown
Length overall
Not reported
Beam
Not reported
Draught
Not reported

Length is the sum of the two AIS reference-point dimensions fore and aft; beam is the sum of the port and starboard pair. Both come from the vessel's own static report.

Voyage & motion

Destination
Not reported
ETA
Not reported
Navigational status
Not reported
Speed over ground
Not reported
Course over ground
Not reported
True heading
Not reported

Destination, ETA and navigational status are typed in on the bridge, not measured. Speed, course and heading come from the vessel's instruments.

Last known position

We hold no position for this vessel.

We have a static report — the vessel identified itself — but no position report has reached our store. That usually means it is out of range of any shore-based receiver we read — mid-ocean, or on a coast nobody is listening from — or that it has not transmitted since our last ingest. We will not invent one.

Why a vessel disappears from a live map →

What this data means

Reading this record

Everything above comes from two different AIS transmissions. Position, speed, course and heading arrive in message 1, 2 or 3, broadcast every few seconds while under way — that is why the position age above can be very small. Name, MMSI, IMO number, call sign, type and dimensions arrive in a separate static report — message 5 for a Class A transponder, message 24 for Class B — sent only around once every six minutes. A vessel can therefore show a fresh position with an old or missing static report, or the reverse.

Nothing here is estimated, interpolated, or carried over from a previous ship at the same MMSI. Where the vessel did not transmit a field, or transmitted a value the standard defines as "not available", we print “Not reported” rather than guess.

Data for this page comes from . Field meanings are explained in the reference guides. Nothing on this page is derived, estimated or filled in — where a field is empty, we print “Not reported”.